21 820.


This graphic portrays city skylines of validation onlin 21 CFR Part 820 customers.

Quality Documentation.

To comply with 21 820 as documented in 21 CFR Part 820 it is essential that in the qualification of equipment and processes; you generate and put into place precise and properly scoped documentation. This is the only way to guarantee that a project of this nature will be completed satisfactorily, on time and compliant with Part820 .  When documentation is properly specified at the very onset of a qualification program then there is time for peer reviews to probe, comment and possible amend document layouts, scopes, definitions and above all else 21 820 or 21 CFR Part 820 compliance.  It is also of the utmost importance to ensure that the documents flow chronologically. I.E. you cannot approve a document that relies on data from another document that is not yet approved.  The required sequencing and inter relationship of the necessary compliance documentation is illustrated in the Validation Plan (VP) diagram; (Diagram A, shown below). All these documents are mandated.

VP, URS, DQ, IO, OQ, P1Q, P2Q

There are many manufacturing processes that produce a product or part of a product that cannot be tested without damaging it, or indeed destroying it.  The introduction of Quality Assurance (QA) allowed manufacturers to build and destructively test; such products.  Then using rigorously enforced Quality Control (QC) replicate the tested product exactly, now knowing its performance and limitations.  Pharmaceutical, biotechnical and medical device companies must demonstrate to the regulators that their whole operation is under similar control.  Quality Control that will ensure all operations are documented, all materials are verified as correct and all equipment is qualified as fit for purpose.   All this Compliant Documentation must be in place and in operational use, prior to receiving regulatory 21 CFR Part 820 approval to manufacture.  This status must be maintained to a standard that ensures consistent replication of all the production processes and without ever compromising the quality of that product.  The maintenance of these standards is called 'current Good Manufacturing Practices' (cGMP).  This qualified or approved state is subject to continuous ministering and inspection by the regulatory authorities involved, as long as the product is in production.


Diagram A.

This graphic portrays the relationship between 21 820 and 21 CFR Part 820 validation documentation available from validation online.

Class I devices:  Devices that are defined as non-life sustaining. These products are the least complicated and their failure poses little risk.    Class II devices:  Devices that are more complicated and present more risk than Class I, though are also non-life sustaining. They are also subject to any specific performance standardsClass III devices:  Devices that sustain or support life, so that their failure is life threatening. 


21 820 and 21 CFR Part 820 and Quality Assurance.

Quality Assurance.

The Quality Assurance Department assists all production departments in the development of quality systems and conducts periodic audits to assure that those systems are implemented faithfully, effectively and in accordance with the requirements stated in 21 820 and 21 CFR Part 820.  Quality Assurance has the responsibility to:

a)      Identify and evaluate quality-related problems.

b)      Recommend solutions to quality problems and verify that any problems have been resolved (corrective actions).

c)       Initiate action to prevent the occurrence and re-occurance of quality problems (preventive actions).

d)      Control non-conforming products until corrective action has been taken in accordance with CAPA procedures.

e)      Set quality goals and objectives for the company and develop plans to meet those goals and objectives.

f)       Report to Management on quality related issues.

The Quality Assurance Department is responsible for quality systems and 21 CFR Part 820 compliance, but implementation of these systems and quality per se is the responsibility of each director, manager, supervisor and employee. 

The Quality Control (QC) Departments inspect and test products at all stages of the manufacturing process, from raw materials to finished goods.  Quality Control Managers have responsibility for product release against predetermined specifications.  Due to the varied and highly technical nature of our products, QC functions are distributed throughout the corporation to ensure that testing and inspection are done expertly


This graphic depicts the validation online flow of documents for medical device validation in accordance with 21 820 and 21 CFR Part 820.

DEVICE VALIDATION. Part 820 Overview

The general principles discussed in this diatribe also apply to medical devises and the integration of 21 820 and 21 CFR Part 820 requirements. This chapter will discuss what is different about the process validation of devices.  In the device regulations the term ‘process performance qualification’ is used. In this manual the term ‘performance qualification’ is used instead with essentially the same meaning.

Medical Device Description

A medical device can be any product used to prevent, diagnose, monitor, treat illness, or mitigate a medical condition provided that the principle intended actions are not achieved by pharmacological, immunological, or metabolic means. The range of products in the medical device area is very broad and may encompass a wide array of functions and product characteristics. A medical device could be a surgeon’s glove, a pacemaker, a diagnostic system, an artificial arm, etc. Some devices are considered cross over devices, i.e., devices that include pharmaceutical or biological components and maybe regulated by more than one branch of the FDA. Examples would the implantation devices that are used for delivering therapeutics.

There are many technologies used in the manufacture of medical devises and the integration of 21 820 and 21 CFR Part 820 requirements. The details and extent of performance qualification, process validation and design validation will vary according to the nature of the medical device and the nature and complexity of the process being validated.

Classification

21 CFR Part 820 medical devises and the integration of 21 CFR Part 820 requirements as classified in the regulations of both Europe and the United States, are classified by the level of risk to the patient Class I medical devises and the integration of 21 CFR Part 820 requirements when used, as intended by the manufacturer by a practitioner skilled in the art do not present a potential risk of death or permanent injury to the patient. These devices are generally not life-supporting or life-sustaining or are not for a use that is of substantial importance in restoring human health or quality of life. Class II (a & b) medical devises and the integration of 21 CFR Part 820 requirements impose some risk of permanent injury to the patient but generally the risk of death is unlikely. Class III medical devises and the integration of 21 CFR Part 820 requirements impose the greatest risk of death and permanent injury and require stringent validations. The classification of the device may give some guidance on the extent of the validation efforts.

Design of Medical Device.

For medical devises there are in 21 CFR Part 820 quality system regulations concerning design controls. Design control is a formal process that takes product design through a series of defined activities, from identification of product requirements and specifications to rigorous product testing based on user needs.

Each manufacturer shall establish and maintain procedures to control the design of the device in order to insure that design requirements are met. These procedures should meet the intent of the FDA Part 820 Quality Systems Regulations (QSR5) for medical devises and the integration of 21 CFR Part 820 requirements and include methods used in, and facilities and controls used for, the design, manufacturing, packaging, labelling, storage, installation, and servicing of all finished devices. This would include the initial design efforts and consideration of all subsequent changes.

These design control procedures should define requirements for the design phases, the review, verification and validation required at each phase, and responsibility and authority at each phase. The basic phases of a typical design control process include:

·            Design and Development Planning (Planning)

·            Design Input (Requirements)

·            Design Output (Specifications)

·            Design Verification (Qualification Testing)

·            Design Review (Design Qualification)

·            Design Transfer (Technology Transfer)

·            Design Validation (Testing in Actual or Simulated Use Environment)

·            Design Change (Change Control)

Design Review is an important concept in the 21 CFR Part 820 device regulations. These reviews must assure adequacy of requirements specifications testing and test results. These reviews must also assure appropriate traceability from all the requirements to specifications to testing and test results. Traceability shows that design input is linked to design output, and has been verified and will be qualified in the Design Qualification (DQ).

Design Control.

When designing devices, the practitioner needs, as well as patient needs must be considered. Use of focus group studies and customer input is invaluable. Where possible, devices should always he designed to assure that practitioner performance and the device combine to meet patient needs with a high degree of assurance. There are a number of variables that can in the performance of individuals using equipment and devices. Sometimes errors in use can cause harm to the patient or the health care provider. Therefore, the device (including labelling and instructions for use) must be designed in such a way that minimizes errors that could cause injury to the patient or health care provider. Some rules of thumb that are worth considering are included in the FDA publication called “Do It by Design”.

Risk Analysis

Risk analysis is another tool for considering design factors appropriately. A documented risk analysis or a justification for why a risk analysis is not needed must be developed and is required to be completed for each device that is being validated. The results of any risk analysis should be evaluated and any significant risks should be appropriately mitigated.  Where possible or appropriate, risk analysis techniques should be extended to processes as well, (see the FDA guidance on Hazard Analysis for Critical Control Points, HACCP).

Identification of Process Parameters and Settings

In preparation for the actual process validation, the critical process parameters and their settings should be identified. For the introduction of new products in existing processes or for processes being changed, the process parameters and settings could be based upon existing knowledge of the process behaviour. A feasibility study may he performed to confirm the correct process settings. In the case of a new process for which these critical parameters and their settings are unknown, the following approach is recommended:

·            Determine the possible variables that may affect the process and its output.

·            Select measurement instruments and methods based on the parameters and ranges for the settings and conduct evaluations of test and measurement uncertainty for all measurement instruments and methods.

·            Investigate the influence of these factors on the process behaviour and determine the processing windows as a basis for the final process design. This may he done by input from subject matter experts and so called ‘screening design of experiments’ where the major factors are defined.

·            Further evaluate the process using a design of experiment focused on process robustness (e.g. a Taguchi experiment), where the process is varied within the processing ranges to assure that product quality is not excessively degraded by normal process variability.

·            The process may be further refined by conducting optimization studies using techniques such as Evolutionary Operations (EVOP) studies and Response Surface

·            Modeling (RSM).

·            To determine if the process functions reliably within the process ranges. Process Capability and Process Performance studies maybe performed. To get a reliable estimation of the Process Capability (Cpk) over time (process performance). the sample size must be sufficiently large and appropriately stratified to assure that a complete cross section of the population is included in the sample.

·            Where process capability and process performance does not yield a high enough degree of assurance of conforming product, sampling plans and verification methodologies must be designed that appropriately segregate conforming from nonconforming products.

The identified process parameters and settings are the basis for the actual validation

Validation of Devices.

The validation plan must include the impact on the validation that resulted from the risk analysis for the device. The validation plan must also include at least one design review at the end of validation activities and prior to market release. Other design reviews at the end of various phases of development are also recommended to ensure 21 CFR Part 820 compliance.

The overall validation of a device assures that three major components be addressed:

·            Performance Qualification — approved documented verification that a system, while operating in its normal environment over the expected operating range and capacity load for a specific process, performs as intended.

·            Process Validation — approved documented verification that a production process will consistently result in a product that meets specifications.

·            Design Validation - Ensures that devices conform to defined user needs under actual or simulated use conditions.

For most devices, in-process and finished product testing still play an important role in ensuring that products meet specifications. These verification processes may be part of both validation and routine production.

Performance Qualifications

The following apply generally to any Performance Qualification (but are important enough to emphasize here again.

Challenges to the process should simulate conditions that will be typically encountered during actual production. Challenges should include the range of conditions allowed in standard process operating procedures and should be repeated enough times to ensure that the results are meaningful and consistent. Challenges may need to include forcing the preceding process to operate at the allowed upper and lower limits.

Performance Qualification assures that finished product characteristics are met even if process parameters and process outputs are at the edge of normal operating ranges. A variety of operators that have been trained on the process should he used to assure that training methods, batch records and procedures are adequately challenged during validation testing.

Performance Qualification might include testing the finished device, labeling and for sterile

operating conditions on initial production units, or their equivalents. Process validation and design validation using initial finished devices are closely related.

Design validation can be conducted using finished products made during process validation studies. Design validation shall ensure that devices conform to defined user needs and intended uses and shall include testing production units under actual or simulated use conditions.  User representatives and focus groups are recommended to assure that the design and directions are adequate and can be understood by the user.

Instructions for use must be properly written and translated to assure that the intended use of the device is clearly communicated.

Documentation.        

In addition to the requirements already discussed, a reference should be made to the location of protocols and validation results in the Design History File (DHF). The operational monitoring  and other production-related procedures are part of the device master record (DMR).


21 820.

Definitive Validation Manual (Issue 3.) -- $1,160.00


This Corporate Validation Manual (CVM) is supplied loaded to a memory stick (MS) and complete with the attachments that are listed in the graphics below. These high quality documents and protocols are all constructed in Microsoft Word. Each document is preceded by an SOP which prompts you through the procedure of populating and then customizing the template, into your own bespoke company document.  This MS has real documents, detailed, compliant and interactive, but most of all - Highly Cost Effective. These documents have evolved through over thirty years of joint validation expertise, they will free up a lot of your time and enable you to deliver your validation projects and tasks on time.
Click For Further Information.

Quantity